1 System Rating & Compliance Goal

kW
Accounts for dead volume / pickup tube height.

2 24-Hour Dynamic Load Profile

Model your facility’s operational shifts. Total hours must equal 24.

Peak Demand Period
%
Hrs
Average Operational Period
%
Hrs
Standby / Night Period
%
Hrs

3 Multi-Tank Storage Configuration

Liters
Main underground or external storage.
Liters
Sits adjacent to the generator.

4 Runtime & Compliance Analysis

Weighted Average Load
0.0 %
Blended Hourly Burn Rate
0.0 L/hr
Day Tank Autonomy (Pump Failure)
0.0 Hours
Total System Runtime
0.0
Continuous Hours
Total Fuel Volume: 0 Liters
Usable Capacity (90%): 0 Liters
Days of Autonomy: 0.0 Days